Checklist

New hire ride-along checklist: what a new technician should see, do and sign off in the first two weeks

A ride-along is not "follow Mike around for a week." It is a list of things the new tech has to see, then do with help, then do alone. Here is that list, split by day, with the sign-offs that decide when they get their own truck.

Most ride-alongs fail the same way. The new hire sits in the passenger seat for a week, watches a good tech work fast, carries parts, and learns very little that is written down. Then they get a truck, and the first callback shows what nobody covered.

The fix is to treat the ride-along as three stages for each skill: see it, do it with help, do it alone. A skill is signed off only at the third stage. The checklist below is built that way.

Note. This covers company process, not trade licensing or required safety training. Licensing and supervision rules for apprentices and helpers vary by state and trade; check with your state board. Your OSHA training obligations depend on the work; your safety program comes first.

Before day one

  • [ ] Lead tech chosen, and told this is part of their job this week (and how it affects their pay, if they are on commission or flat rate)
  • [ ] Lead tech's schedule lightened: fewer or simpler jobs, with longer job duration estimates
  • [ ] New hire's phone set up with the field app, login tested
  • [ ] Uniform, ID badge, PPE and basic hand tools issued
  • [ ] Copy of this checklist printed for both of them

Plan on the ride-along truck doing fewer jobs. A lead tech teaching on every job runs slower. Say the lead normally runs J jobs a day and teaching slows them by a share s. The ride-along truck books about J × (1 − s) jobs. With J = 5 and s = 0.2, that is 4 jobs a day, so remove one from the board before it is booked, not on the morning of.

Days 1 and 2: see it

  • [ ] Morning routine: start time, where the truck is loaded, how the day's jobs are received
  • [ ] Vehicle check: fluids, tires, lights, ladder rack, load secured
  • [ ] Truck stock: where each part lives, how restock is requested
  • [ ] Customer arrival: parking, knocking, introduction, shoe covers, where to set tools
  • [ ] How the lead explains the problem and the price before work starts
  • [ ] Field app: on my way, arrived, notes, photos, parts used, done
  • [ ] Photo standard: what to photograph before, during and after
  • [ ] How the lead handles a job running long (who they call, what they tell the customer)
  • [ ] End of day: paperwork, cash or card handling, truck clean-out

Days 3 to 5: do it with help

  • [ ] New hire runs arrival and introduction, lead watches
  • [ ] New hire marks app status on every job
  • [ ] New hire takes the photo set on every job, lead checks it
  • [ ] New hire writes the job notes, lead reviews before closing
  • [ ] New hire does the diagnosis on at least one simple job each day, lead confirms
  • [ ] New hire explains the repair and price to a customer with the lead present
  • [ ] New hire loads and restocks the truck at end of day

Week 2: do it alone, with the lead nearby

  • [ ] New hire runs full jobs while the lead stays in the truck or on a nearby job
  • [ ] Lead reviews notes, photos and parts on every job that day
  • [ ] New hire handles a running-late call to the office
  • [ ] New hire handles an upset customer conversation (role-play counts if none comes up)
  • [ ] New hire works a full day in the heat or cold your season brings, at a gradually increasing workload

On that last item: OSHA says almost half of heat-related worker deaths happen on the first day on the job or the first day back after a long absence, and recommends new workers start at about 20 percent of a normal shift's duration in the heat on day one and add about 20 percent per day (OSHA: Protecting New Workers, checked October 2026). Build that into summer ride-alongs.

The solo sign-off

The lead tech and the service manager sign each line. Any line not signed means more ride-along days, not a solo truck.

Skill Seen Did with help Did alone Signed
Vehicle check and loading
Customer arrival and introduction
Diagnosis on common job types
Explaining price before work
App statuses, notes, photos, parts
Handling a job running long
Safe work practices for your trade
End-of-day close-out

How to adapt it

For experienced hires. Compress days 1 to 5 into one or two days focused on your process (app, photos, pricing, arrival standard). They know the trade. They do not know how you work.

For apprentices and helpers. Stretch the do-it-with-help stage across several weeks, and add your trade's skill list from your apprenticeship program or state requirements.

For crew trades. In roofing, solar or install work, the new hire rides with a crew rather than a single lead. Assign one named person on the crew to sign off, or nobody will.

After sign-off, keep watching the numbers that show whether onboarding worked: first-time fix rate and callbacks for their first 60 days. The broader process is in the technician onboarding definition, and the retention side is in our guide to field technician retention. New techs who feel trained in week one stay longer than those who feel thrown in.

What to take away

  • Split every skill into see it, do it with help, do it alone, and sign off only the last stage.
  • Lighten the lead tech's schedule before the ride-along starts, not on the morning of.
  • Build heat acclimatization into summer ride-alongs, following OSHA's guidance.
  • Watch first-time fix rate and callbacks for the new tech's first 60 days.

Common questions

How long should a new technician ride along?

It depends on experience and trade. An experienced tech may need two or three days to learn your process. A new-to-trade hire may need weeks. Let the sign-off sheet decide, not the calendar.

Should the lead tech be paid more during a ride-along?

If the lead is paid by job, commission or flat rate, teaching slows them down and costs them money. Most companies adjust pay or job count for that week. Whatever you choose, say it before the ride-along starts.

What should a new technician do on the first day?

Mostly watch, with a clear list: vehicle check, truck stock layout, customer arrival, the field app, the photo standard and end-of-day close-out. Doing comes on day three.

What is the difference between a ride-along and onboarding?

Onboarding is the full process from hire to independent work, including paperwork, safety training and tools. The ride-along is the field part of it, where the new hire learns your process on real jobs.

See your own day on it

CrewLink offers only the times a crew can actually reach, from where the truck will be. Plug in your trucks, services and city and see how your week would run, then walk through it with your own territory. CrewLink is in early access.

Set up your CrewLinkIndependent contractor? Join CrewConnect