Optional Meta advertising cookies

Allow Meta to measure visits and completed signups across CrewLink's website and signup pages. This can share browser and advertising identifiers with Meta. Details and other tracking

Glossary

Jobs per day

The number of jobs a technician completes in a working day. Easy to count, and only meaningful when you know what is in the denominator.

See the problem. Try the solution.

The lead is ready. The calendar looks open.

A homeowner asks for 10:00. The technician finishes the previous job at 10:00 across town.

HOMEOWNER ON THE PHONE“Can you come at 10?”
One technician’s morningTuesday
Previous appointmentFinish the work already booked.
30 min travelAt this time of day
New service appointment60 minutes on site
Next appointment · 20 min away
10:00Open on the calendar.
Still on the road.
Travel fits.
The work fits.
10:30 fits this sample day.
01 / 04Skip to details

Jobs per day is the average number of jobs a technician completes per working day. It is calculated as completed jobs divided by technician working days in the same period.

How to calculate jobs per day

Jobs per day = Completed jobs ÷ Technician working days

Say eight technicians each worked 21 days last month, and the team completed 840 jobs. That is 840 ÷ 168, or 5.0 jobs per technician per day.

The ceiling on the number is set by three inputs:

Maximum jobs per day ≈ Available hours ÷ (Average job duration + Average drive between jobs)

With 8 available hours, 60-minute jobs and 30-minute drives, the ceiling is about 5.3. Cut the average drive to 20 minutes and it rises to 6.0. That is the arithmetic behind most of what moves this metric, and the jobs per day calculator lets you run it on your own numbers.

Why it matters for scheduling

Jobs per day is where drive time shows up as lost revenue. Job duration is largely fixed by the work. Drive time between jobs is largely set by how jobs were booked. So when two teams with the same job mix differ on jobs per day, the difference is usually geography and booking order, not effort.

That makes it a scheduling metric as much as a labor metric. Booking each job next to the work already on a truck, with drive time checked at the moment the slot is offered, raises the ceiling. The full breakdown, including how job mix distorts comparisons, is in Jobs per day per technician.

A common mistake

Comparing jobs per day across different work. A maintenance-heavy team and an install-heavy team will never match, and a technician doing three diagnostic calls is not less productive than one doing seven filter changes. Compare within one job type, or weight jobs by expected duration.

The other mistake is pushing the number up by shortening jobs on the board. If job duration estimates are cut below reality, jobs per day rises on paper and callbacks rise in the field.

Related terms

Common questions

How many jobs per day should a technician do?

It depends on job type, duration and territory size. Calculate your own ceiling with the formula above, then compare your actual number to it. The gap is the opportunity.

Should cancelled jobs count?

No. Count completed jobs only. Track cancellations separately, since they create a gap in the day that drives idle time.

Does adding technicians raise jobs per day?

Not per technician. More trucks spread over the same territory can raise total jobs, but per-truck density often falls unless booking keeps each truck's work close together.

See your own day on it

CrewLink offers only the times a crew can actually reach, from where the truck will be. Try the sample day, then start free with your own trucks and services: no credit card for your first 50 scheduled jobs.

Start freeTry a sample dayIndependent contractor? Join CrewConnect